Grid-ready for AI data centers and beyond
In the room
Novos Power is building power infrastructure for AI data centers using its Variable Airgap Solid State Transformer technology, positioned around speed, reliability, scalability, and direct utility-feed interconnects.
Novos Power was showcased at SF Playground—one of the most voted startups on the floor.
AI data centers face megawatt-scale, millisecond-level power swings that strain legacy power delivery systems and create infrastructure bottlenecks.
SF Playground featured Novos Power as a participating startup in Pitch Playoffs 002.
The company’s public materials emphasize scalable, high-density power delivery and direct 13 to 48 kV utility-feed interconnects for next-generation compute infrastructure.
Novos Power left with real connections and momentum—not just a pitch slot.
Pitch live, get voted, and leave with introductions that turn into momentum.
Get on the listGrid-ready for AI data centers and beyond
In the room
Novos Power is building power infrastructure for AI data centers using its Variable Airgap Solid State Transformer technology, positioned around speed, reliability, scalability, and direct utility-feed interconnects.
Novos Power was showcased at SF Playground—one of the most voted startups on the floor.
AI data centers face megawatt-scale, millisecond-level power swings that strain legacy power delivery systems and create infrastructure bottlenecks.
SF Playground featured Novos Power as a participating startup in Pitch Playoffs 002.
The company’s public materials emphasize scalable, high-density power delivery and direct 13 to 48 kV utility-feed interconnects for next-generation compute infrastructure.
Novos Power left with real connections and momentum—not just a pitch slot.
Pitch live, get voted, and leave with introductions that turn into momentum.
Get on the list